Infrastructure Design and Roadwork Modification
Infrastructure Engineering
Infrastructure Design and Roadwork Modification
Our scope for the Infrastructure Design and Roadwork Modification included infrastructure concept, preliminary, and detailed designs, Road Safety Audits, ITS approvals, and the integration of wet and dry utilities.
Status
Completed
Overview
The project ENHANCEMENT OF RIGHT TURN aimed to enhance traffic flow and reduce congestion by implementing strategic infrastructure design modifications. The primary goal was to create a more efficient traffic movement through targeted changes to the existing road layout, especially focusing on facilitating smoother turns and minimizing signalized right turns that can cause traffic backlogs.
Scope of Work
What we did:
Roads Concept DesignDeveloped an innovative road design concept to resolve traffic bottlenecks while ensuring compliance with regulatory requirements.
Preliminary DesignCreated initial design layouts incorporating client and stakeholder feedback, ensuring a practical and functional approach.
Roads Detailed DesignCombined Stages 1/2 Road Safety Audit (RSA) to ensure the design met safety standards.
Secured Intelligent Transport Systems (ITS) approval, ensuring the design aligned with modern traffic control and monitoring systems.
Prepared a Detailed Road Design, focusing on optimizing the road layout and traffic movements.
Designed and integrated both wet and dry utilities to align with the project's overall infrastructure needs.
Approval ProcessSuccessfully obtained design approvals from the client and relevant authorities.
Managed the submission and approval of Town Planning Approvals and Design NOCs to ensure the project adhered to municipal and regulatory guidelines.
Project Highlights
Key objectives:
01Implementation of free right turn towards over bridge in place of signalized right turn to facilitate the movement of traffic and minimize any backlogs
02Modifying the central median noses and chamfering on side of the junction to better facilitate double left turn traffic movements
03Total approximate surface area of the affected roadworks to be modified is 600 m2
Outcome
By employing precise engineering solutions and obtaining the necessary approvals, we ensured that the project not only met traffic efficiency goals but also complied with all safety and regulatory standards. The modifications have improved the traffic flow at the junction, reduced signal delays, and created a safer and more efficient driving environment for road users.