AOR Services for Stormwater Authority Approval

Architect of Record (AOR) services for stormwater design authority approval in Abu Dhabi, including preparation and submission of documentation, coordination with relevant authorities including ADNEC, management of authority comments, and follow-up through to final approval

Client
ADNEC
PMC
TED JACOB
Location
Abu Dhabi
Year
2026
Status
Completed
Overview

The project involves providing AOR services to facilitate the authority approval of stormwater design documentation. Super Arc Consultant LLC (SAC) is responsible for compiling submission packages based on information provided by the client or design consultant, submitting documents to the relevant authorities, coordinating responses to authority comments, and managing resubmissions until final approval.

The scope includes liaison with authorities, including ADNEC, and attendance at stakeholder meetings or clarification sessions where required. Engineering design, hydraulic calculations, technical drawings, and design compliance remain the responsibility of the originating design consultant, with SAC's role limited to authority submissions and coordination.

Scope of Work

  • Act as Engineer of Record (AOR) for authority submission purposes.
  • Review and compile client-provided stormwater drawings and supporting documents.
  • Prepare the required authority submission package based on information provided by the client or design consultant.
  • Submit stormwater design documentation to the relevant authorities.
  • Liaise and coordinate with authorities, including ADNEC.
  • Address authority comments in coordination with the client and design consultant.
  • Coordinate and manage resubmissions using revised documents provided by the design consultant.
  • Attend stakeholder meetings and clarification sessions, where required.
  • Follow up with authorities throughout the approval process.
  • Obtain and hand over approved stormwater design drawings as issued by the authority.

Project Highlights

Stormwater Design Authority Submission and Approval Coordination

01Provision of AOR services for stormwater design authority approval.
02Compilation and submission of technical documentation provided by the client and design consultant.
03Coordination with relevant authorities, including ADNEC.
04Management of authority comments, clarifications, and resubmission procedures.
05Coordination between the client, originating design consultant, and reviewing authorities.
06Structured follow-up throughout the authority approval process.
07Clear separation of authority coordination responsibilities from engineering design and hydraulic analysis.
Outcome

Stormwater Authority Approvals Through Dedicated AOR Coordination

Complete authority submission package compiled from client-provided documentation.

Formal submission of stormwater design documents to the relevant authorities.

Coordinated responses to authority comments and clarification requests.

Managed resubmissions in coordination with the originating design consultant.

Approved stormwater design drawings issued by the authority.

Improved coordination between project stakeholders and the authority approval process.

Support toward final approval through systematic follow-up and documentation management.